To provide a common reference point measure up 8 in.
Intaling vinal siding.
It is important to check your level every four or five courses by putting a level on the siding.
Begin by installing the first row of siding on both sides of the deck.
It will be made of aluminum and it usually comes about 3 inches in width and 12 feet long.
Install vinyl siding from the foundation up snapping successive pieces into the lip at the top of each piece and nailing the siding to the side of the house.
On hot days because the siding will contract when the temperature drops.
Gap for expansion wherever siding butts accessories.
Find useful tips in our manual including historic restoration how to clean vinyl siding including stain removal and recycling leftover vinyl siding scrap.
We cover how to move doors and windows and create a weather proof exterior.
The siding slides behind vinyl siding trim pieces that hide the gap and the cut end.
Vinyl siding must be nailed so expansion and contraction are not restricted.
Getting started on installing vinyl sidding.
The thickness of wood sheathing counts toward the total thickness that the fasteners must penetrate into nailable material usually 1 1 4 32mm.
Siding must be cut in lengths to provide for expansion.
Not just another vinyl siding installation video.
Allow a 1 4 in.
Vinyl siding can be installed over common wood sheathings such as plywood oriented strand board osb or other materials e g foam plastic insulating sheathing.
This is our most comprehensive.
Always refer to the installation guide on the particular vinyl siding that you re installing but most vinyl siding panels should overlap each other by at least an inch.
To prevent the relatively thin panels from buckling observe these fitting and nailing rules.
Created by the vinyl siding institute vsi this manual includes installation instructions based in part on astm d4756 standard practice for installation of rigid pvc siding and soffit.
When installing in freezing weather below 40.
The first piece of vinyl you re going to hang is on the starter strip.
Gap at all ends.
Avoid nailing siding too tightly as.
From the top of this row and stretch a string line across the deck.
To install vinyl siding to the soffit and fascia area on your home nail lengths of j channel along the inner edge of the fascia leaving the nail heads out about 1 32 to 1 16 of an inch.