Begin at the bottom edges of the roof and go up.
Installing tar paper on hip roof.
Drip edges on the eaves any valley liners and all flashing should be installed before the tar paper is laid.
Use a tin snips to cut the drip edge to size.
Begin your first row of tar paper with the bottom of the tar paper.
Have a helper ready to assist with this step and take care to get the lines straight and clean.
Use a ladder to reach the bottom level of the roof.
Nail it every couple of feet.
Adjust the felt as you roll it making sure that it s straight with no bubbling.
Before applying roofing you ll need to cover the sheathing with roofing felt also often called tar paper most local codes call for using 30 pound felt.
Then i run a r.
Lay the first strip of tar paper side to side with its bottom.
Measure the size of your roof in square feet.
Lay the first course of tar paper lengthwise on the roof so one edge is covering the drip edge nailed to the roof.
How to lay roofing felt on a hip roof.
Position the first row of roofing felt flush on the bottom with the edge of the gutter apron.
Chalk lines should be snapped 33 5 8 above the eave line.
How to install roofing tar paper step 1.
Take a close look at how i paper the 30 in the center of the valley.
Lay the next strip.
Some roofers prefer to attach felt underlayment with 1 inch roofing nails or special nails with plastic washers but most codes allow staples which are easier to drive.
Start at the bottom of one side of the roof at the right or left edge.
Measure the width and height of each section separately.
Install the drip edge on the gable ends of the roof after you finish installing your underlayment.
I swear it is the fastest way out there.
For hip type shed roofs which include slopes on all 4 sides begin at the square hip at the top of the roof.
Roofing felt comes in rolls that feature pre marked lines 2 to 3.
Multiply the width by the height for the.
How to install roofing tar paper.
Setting the roll and then nailing off.
Never install the felt vertically across your roof.
Measure your roof s surface in square feet and purchase enough tar paper to cover the entire surface twice.
Unroll the paper on the roof and cut it to the correct length with a utility knife.
This video walks through the very basic steps for installing tarpaper felt.
Allow about 1 foot 0 30 m of the felt to hang over the hip.
Starting a roof with tarpaper felt.
Staple it to the plywood with a staple gun placing the staples at 6 to 8 inch intervals along the edges and in the middle of the paper.