Project step by step 20 cutting the gutter.
Installing a gutter pop.
Form strip miter joint at corner cover the joint between two lengths of gutter at each corner with a strip miter a 3 inch wide strip of aluminum.
Use the flange to mark the screwhole locations and bore 1 8 in holes through the gutter.
To control the flow of water away from a roof gutter downspout installing a 9 to 12 inch catch basin is recommended.
Cut a starter hole in the gutter with a chisel drill or sabre saw and nibble out the finished opening with tin snips.
Finally insert the filling into the hole and fasten it with short screws.
Dig a trench large enough to hold the catch basin.
Pop up drains are available in an assortment of brands and sizes and package directions will provide details to aid your decision.
Cut a triangular section from.
Step 3 optional catch basin.
Secure it with eight pop rivets or sheet metal screws.
Wrap the aluminum strip tight around the underside of the gutter.
Cut a two inch long notch in the front lip of the gutter with tin snips to join a rain gutter section.