Cut half inch notches into the z flashing on both ends where the flashing bends using the tin snips.
Install z flashing siding.
Attach j molding to the sides of the opening.
Install the trim just under the drip cap.
If only the surface is damaged.
Item 3807 model 5504900120.
Next comes another layer of building wrap installed like the first layer.
How to install z flashing on rotted t1 11 siding 1.
When reading the installation details for hardie siding lp smart lap and tru wood sidings the z flashing is always shown with at least a 5 degree angle away from the building.
At the top tuck metal drip cap flashing under the siding and on top of the second layer of wrap.
You set flashing upon top edge of each piece of plywood over a fat bead of caulk and hold it in place with just heads of roofing nails driven into sheathing.
Galvanized z flashing so called because of its z shaped profile keeps water from getting through horizontal joints between sheets of plywood siding.
Inspect the sidewall around and underneath the fascia and inside the house for signs of moisture damage and repair any rotted areas.
Begin at either end of the wall and set the level middle.
Scrape loose paint off the rotted area with a putty knife and use 80 grit sandpaper to smooth the rough surface if.
Although commonly called z flashing the z has squared corners and it could as easily have been named stair step flashing.
Window and door cap 1 25 in x 120 in x 1 56 in aluminum z flashing.
Again slide the pieces under the siding and remove pieces of siding as necessary and reattach them after you ve nailed the flashing and molding in place.
The instructions also call for at least a 1 4 gap between the materials at the site of the z flash.
Because the end grain wood at the top and bottom of plywood sheets easily absorbs and holds water it is especially important to protect it and avoid wood rot developing around the joints.
This allows you to bend the center part of the flashing over the sides of the door to cover the.
Install the first length of z flashing.
Complete the installation of the first horizontal row of t1 11 siding following standard construction practices.
Test the rotted area of the t1 11 siding by poking it with a nail or a screwdriver.
How to install z flashing on t1 11 siding.
We see it most often used at the horizontal joint between two sheets of plywood exterior siding to provide protection from water seeping in at the opening.
Install the kickout flashing underneath the first shingle photo 1.
Attach z flashing at the top of the opening.