The original battens were left to maintain structural integrity and new 70 x 35mm pine battens secured to.
How to lay roof tiles australia.
Despite being over 40 years old this hardwood roof was still mostly in good condition.
With staggered broken or cross bond tiles in each alternate course overlap by half the tiles above and below them.
You can see in the photo the bitumen coating and their resemblance to a cement roof tile.
You should have reinforced the frame of the roof earlier before.
Remove old roofing if applicable.
They are galvanized steel pressed metal roofing sheet which were popular in the 1970 s 1980 s as a roofing material.
With straight bond the sides of tiles form straight lines from bottom to top course.
This all depends on how big your roof is and a number of other factors our roofers provide a comprehensive roofing service.
Position the first.
After a section of tile was removed the timber ridge rafters and battens were inspected and checked for level.
Where the different sides of the roof meet.
Valley seals are also placed under the tiles in the valleys to prevent flooding.
Construction usually takes around 1 2 days to get a concrete or terracotta tile roof installed and 1 day for a composite tile roof.
This is on its own a major job that can take days and require special tools.
Repair and reinforce the roof if applicable.
Tiles at the edges are cut to make even lines along the hips and valleys of the roof i e.
Tiles are then laid out across the roof and clipped on.
How to tile a roof if you would prefer to read how to tile a roof and see more help please visit this link unless you found this video via my website.
Removing tiles can be slow as they can be nailed or wired down.
They were formed into the shape of 5 tiles and coated with a bitumen coating with a fine stone aggregate embedded in the coating.