Cut the rolled roofing.
How to install roll shingle roofing.
Every 5 inches make a new mark until you get to the rop of the roof.
It also helps if you first install a layer of roofing felt.
To seal a plumbing vent spread roofing.
Plan so that no two butt joints are closer than 2 feet from each other.
Use your chalk and tape measure to mark about 12 inches up on the roof for the first set of shingles.
To install roll roofing you ll need to cut the material into long strips of the correct length for your roof and lay it flat.
Continue to chalk additional guidelines based on the width of the shingle through at least four courses rows across the roof.
Drip edge or drip cap is either plastic or sheet metal.
Using a measuring tape measure 35 inches 89 cm up from.
Prepare a valley between joined roofs by cutting a strip that is 18 inches wide and covers the entire length of the valley.
Mark a chalk line to identify the end of your first layer.
Nail it in place with roofing nails that penetrate at least 3 4 inch into.
It not only protects the roof but it also protects the fascia.
Spread the roofing cement along the.
Install roll roofing when the temperature is at least 50 degrees fahrenheit to keep the material from cracking.
Repeat this on both sides of the roof.
Use a trowel to scoop up the roofing cement.
For extra durability you may install roll roofing in two layers.
Apply roofing cement to the roof.
The strips should always be horizontal.
Install peel and stick roofing in a similar manner.