It also helps if you first install a layer of roofing felt.
How to install mineral guard roll roofing.
The roof area is 14 ft.
Full installation guide for low slope.
To install roll roofing you ll need to cut the material into long strips of the correct length for your roof and lay it flat.
The following is excerpted from gaf s roll roofing installation instructions cited below.
This video demonstrates proper application techniques for tarco fiberglass mineral surfaced roll roofing.
The strips should always be horizontal.
The roofing screws were 1 1 2 inch and went thru the drip edge and into the stud below.
Cements become viscous and difficult to apply at low temperatures.
Cut a hole in the roll roofing and slip it over as well.
Underlayment beneath mineral guard roll roofing has many benefits including acting as a secondary water resistant ply and preventing sap in some wood decking from reacting with the mineral guard roll roofing.
The piece should overlap the lower course by at least 4 inches.
Apply roofing cement to the roof.
Puting the weather watch rolled roofing material on was real easy and fast to install.
To seal a plumbing vent spread roofing cement around the pipe.
Rolls become brittle and may crack at low temperatures.
Cut a hole in a piece of roofing about 2 feet wide and slip it over the pipe.
Use a trowel to scoop up the roofing cement.
Store all rolls and cements for at least 24 hours at or above 55 f 12 8 c prior to their.
Be especially careful when installing mineral guard roll roofing in temperatures below 45 f 7 2 c.
Gaf mastering the roof chapter 14 the liberty system is designed for both new roofing and re roofing applications.
Spread the roofing cement along the edges of your roof so it s about 1 8 1 4 inch 3 2 6 4 mm thick.