Make sure that your last panel is at least 3 wide.
How to install dricore wall panels.
Start at the longest wall and pre measure the length and width of the floor area to ensure the last panel pieces in each row end are greater than 6 in width.
Adjust the starting panel of each row to accommodate for the end of row panel width.
Once the walls are framed and in position simply screw the bottom plates of the 2 x 4 wall to the dricore subfloor panels using 2 wood screws.
When installing dricore smartwall panels over existing floor surfaces the existing floor surface must be clean structurally sound and free of debris or materials that may impair the performance of the panels.
Install your 2 x 4 walls directly on top of the dricore subfloor panels measuring for a snug fit between the panels and ceiling.
Metal stud base plates should be anchored in concrete every 2 when installing over dricore panels.
When you start your second row the panel must be at least 6 wide.
For example for every 8 length of base plate install only two concrete anchors.
Dricore subfloor panels need minimal equipment to install as they are designed to interlock with a tongue and groove feature.
If you are planning to use metal studs in place of wood the base track for the studs should be affixed to the dricore panels with 5 8 wood screws as a maximum.
How to install dricore smartwall what is dricore smartwall.
Christine of the diy dreamer recommends measuring your first row prior to installation.