Center a strip.
How to glue drywall to concrete block wall.
The hat channel image 1 should be attached to the wall using concrete nails and concrete nail gun images 2 and 3.
Cut the nozzle end of a tube of construction adhesive at a 45 degree angle using a utility knife.
You can use standard 2 x 4 boards and strong adhesive to create a wooden framework to which you can easily attach your paneling.
Cut enough furring strips from 1 by 3 inch lumber with a circular saw to allow you to space them 16 inches apart for.
Make marks on the wall that are 16 inches apart starting at one end and working toward the other.
Use concrete nails and a concrete nail gun to attach the hat channels to the wall after drawing a plumb line to make.
First draw a plumb line to make sure the hat channels will be spaced properly for the size of drywall and insulation you re using.
Drive three concrete nails spaced at even intervals through each side of each hat channel.
Here are some tips to.
How to adhere drywall to a concrete block 1.
Measure the height of the wall from floor to ceiling.
How to attach drywall to concrete block step 1.
The strips should be roughly 16 to 24.
Want the block wall in your basement to have a more finished appearance.
Find a mark for.
One common technique is to cover the block wall with drywall.
Frame out the rest of the wall by adding faux top and sole plates dropping the top a bit for a drop ceiling if.
Trim each strip with a circular saw to match these.
Determine where you will install furring strips along your block walls.
How to glue drywall to the interior of concrete block walls step 1.