How to frame poured walls.
How to fur a concrete wall.
Tapcon concrete screw installation.
With a pencil or a.
With a pencil or a marker draw vertically lines from.
Step 2 place the first furring strip over a vertical line.
Mark the cinder block wall every 16 inches vertically and then every 16 inches horizontally to form a grid pattern.
Using the level plumb down the wall and draw a line for reference.
Whether poured or block built properly a concrete wall is strong and will not rot warp or invite termites and other.
Using a hammer drill drill holes using the correct diameter carbide tipped masonry bit for the concrete screw diameter.
Mark the wall for vertical furring strips installed 16 inch on center.
Now repeat this process at the top of the wall.
Make exact measurements ensure.
You can t deny that concrete walls are efficient.
Use chalk to draw the lines and a straight edge as a guide.
These markings will indicate where you will vertically attach your.
Equip yourself with a tape measure and spread it cross the bottom of the wall your about to furr out.
Determine the desired position of the furring strips or 2x4s before drilling any holes.